2010 SPRING LOAD RESTRICTIONS
Changes From 2009

Highway

Location

MRM’s

Length

2009
Postings

2010
Postings

Region

SD 26

Polo to SD 45

246.90 to 252.85

6.0

May Post?

None

Aberdeen

SD 45

Platte north to I-90

27.00 to 51.59

24.6

None

7 Tons/Axle

Mitchell

SD 50

I-90 south to Academy

241.59 to 279.00

37.4

None

6 Tons/Axle

Mitchell

SD 63

Four Corners to Cheyenne River

119.1 to 144.6

25.5

May Post?

6 Tons/Axle

Pierre

SD 130

1 mile east of US 12 to SD 271

194.0 to 200.0

6.0

None

6 Tons/Axle

Pierre

US 212

SD 45 to Zell

282.05 to 297.08

15.0

May Post?

6 Tons/Axle

Aberdeen

US 212

Zell to Redfield

297.08 to 306.46

9.4

May Post?

6 Tons/Axle

Aberdeen

US 212

Frankfort to Doland

317.2 to 327.2

10.0

May Post?

None

Aberdeen

SD 248

SD 73 north to west of Kadoka

155.51 to 162.44

6.9

None

May Post?

Pierre

SD 471

Provo to US 18

19.60 to 29.00

9.4

7 Tons/Axle

None

Rapid City

Note: "May Post?" indicates a situation were a road is regarded somewhat susceptible to spring thawing action and may require posting as conditions later warrant.

Return to Spring Load Limit Page.