ROAD CONSTRUCTION / RESTRICTION REPORT
A1 SD134 - MRM 276.6 TO 276.9 - 0.3 MILES -
GRADING, RIPRAP, GUARDRAIL, ASPHALT CONCRETE PAVING AND STRUCTURE
REPLACEMENT - **ROAD CLOSED TO THROUGH TRAFFIC** - COMPLETION
EXPECTED 07/01/08.
A2 US212 - FROM FAULKTON WEST - 9.0 MILES - COLD
MILLING, ASPHALT CONCRETE RESURFACING, SLOPE FLATTENING, BOX CULVERT
REPLACEMENT - TRAFFIC CONTROLLED WITH FLAGGERS AND PILOT CAR - **12
FOOT WIDTH RESTRICTION** - COMPLETION EXPECTED 10/14/08.
A3 US12 - FROM ANDOVER TO BRISTOL - 10.0 MILES
- COLD MILLING, ASPHLAT CONCRETE RESURFACING, PROCESS IN PLACE ASPHALT
CONCRETE SHOULDER - TRAFFIC CONTROLLED WITH FLAGGERS AND PILOT CAR -
COMPLETION EXPECTED 09/01/08.
A4 US281 - FROM MELLETTE TO WARNER - 11.8 MILES
- NORTHBOUND LANES - PROCESS IN PLACE SHOULDER, CRACK AND SEAT PCC
PAVEMENT AND ASPHALT CONCRETE RESURFACING - TRAFFIC CONTROLLED WITH LANE
CLOSURES AND FLAGGERS - COMPLETION EXPECTED 07/31/08.
A5 US212 - FROM ORIENT CORNER TO REDFIELD -
26.0 MILES - GRADING, STRUCTURE AND INTERIM SURFACING - **ROAD CLOSED
TO THROUGH TRAFFIC** - LOCAL TRAFFIC ONLY - DETOUR ROUTE ON US281,
SD26 AND SD45 - INTERIM COMPLETION 11/01/08.
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16
A17
A18
A19
H1 US212 - FROM WEST OF FRANKFORT TO DOLAND -
13.3
MILES - COLD MILLING AND ASPHALT CONCRETE SURFACING - TRAFFIC MAINTAINED
WITH FLAGGERS AND PILOT CAR - **14 FOOT WIDTH RESTRICTION** - COMPLETION EXPECTED
09/15/08.
H2 US14/US281 - IN WOLSEY - 1.2 MILES -
GRADING, CURB AND GUTTER, STORM SEWER, LIGHTING AND PCC PAVEMENT - **11
FOOT WIDTH RESTRICTION** - **105 FOOT LENGTH RESTRICTION** - TRAFFIC MAINTAINED WITH ON-SITE DETOUR AND
FLAGGERS - MINOR DELAYS POSSIBLE - COMPLETION EXPECTED 11/30/08.
H3 US14/US281 - JCT OF US14 AND US281 NORTH OF
WOLSEY - 1.0 MILES - PCC PAVEMENT AND PAVEMENT MARKING - **10 FOOT
WIDTH RESTRICTION** - **105 FOOT LENGTH RESTRICTION** - TRAFFIC MAINTAINED WITH FLAGGERS - MINOR DELAYS
POSSIBLE - COMPLETION EXPECTED 08/30/08.
H4
H5
H6 US212 - REDFIELD TO ZELL - 10.5 MILES -
GRADING AND INTERIM SURFACING - **ROAD CLOSED TO THROUGH TRAFFIC**
- LOCAL TRAFFIC ONLY - DETOUR ROUTE ON US281, SD26 AND SD45 - INTERIM
COMPLETION EXPECTED 11/30/08.
H7
H8
H9
H10
H11
H12
H13
H14
H15
H16
H17
H18
H19
H20
H21
H22
H23
W1 I-29 - FROM 1 MILE SOUTH OF EXIT 140
TO 1 MILE NORTH OF EXIT 150 - 12.0 MILES - PCC PAVING OF THE NORTHBOUND
LANES - TRAFFIC MAINTAINED HEAD TO HEAD IN THE SOUTHBOUND LANES - **12
FOOT WIDTH RESTRICTION** - COMPLETION EXPECTED 10/15/08.
W2 I-29 - 2 MILES SOUTH AND 2 MILES NORTH
OF EXIT 213 - NORTHBOUND AND SOUTHBOUND LANES - BRIDGE REPAIR - ONE LANE
OF TRAFFIC MAINTAINED AT EACH LOCATION - **12 FOOT WIDTH RESTRICTION**
- COMPLETION EXPECTED 10/01/08.
W3 SD15 - OVER I-29 - BRIDGE REPAIR - ONE
LANE OF TRAFFIC MAINTAINED WITH TRAFFIC SIGNALS - COMPLETION EXPECTED
10/01/08.
W4 SD15 - FROM MILBANK NORTH TO COUNTY LINE
- 6.0 MILES - SLOPE FLATTENING AND PIPE INSTALLATION - TRAFFIC MAINTAINED
WITH FLAGGERS - COMPLETION EXPECTED 10/01/08.
W5
W6 SD20
- FROM JCT SD37 EAST THROUGH CROCKER - 19.0 MILES - COLD MILLING AND
ASPHALT CONCRETE RESURFACING - TRAFFIC MAINTAINED WITH FLAGGERS AND
PILOT CAT - COMPLETION EXPECTED 09/01/08.
W7 SD30 - FROM MINNESOTA STATE LINE TO WEST
OF I-29 - 16.0 MILES - COLD MILLING AND ASPHALT CONCRETE RESURFACING -
TRAFFIC MAINTAINED WITH FLAGGERS AND PILOT CAR - COMPLETION EXPECTED
10/15/08.
W8
W9
W10
W11
W12
M1
M2
M3 I-90 - FROM SALEM TO HUMBOLDT - 17.0
MILES - PCC PAVEMENT REPAIR - TRAFFIC MAINTAINED WITH LANE CLOSURES AND
FLAGGERS - COMPLETION EXPECTED 08/29/08.
M4
M5
M6
M7
M8
M9
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19 SD38 - FROM SPENCER WEST TO FULTON - 12.4
MILES - COLD MILLING ASPHALT CONCRETE, ASPHALT CONCRETE RESURFACING, SLOPE
FLATTENING, CULVERT EXTENSIONS AND GUARDRAIL - TRAFFIC MAINTAINED WITH
FLAGGERS AND PILOT CAR - COMPLETION EXPECTED 10/17/08.
M20 SD25 - FROM JCT SD38 SOUTH TO JCT SD262 - 6.0
MILES - COLD MILLING, ASPHALT CONCRETE RESURFACING, SLOPE FLATTENING,
CULVERT EXTENSIONS AND GUARDRAIL - EXPECT DELAYS - COMPLETION EXPECTED
10/17/08.
M21
M22 I-90 - FROM CHAMBERLAIN TO PLANKINTON - 42.5
MILES - PCC PAVEMENT REPAIR - TRAFFIC MAINTAINED WITH LANE CLOSURES AND
FLAGGERS - COMPLETION EXPECTED 10/31/08.
M23 US81 - FROM SALEM NORTH TO THE MINER COUNTY
LINE - 8.0 MILES - COLD MILLING ASPHALT, ASPHALT CONCRETE RESURFACING AND
CULVERT EXTENSIONS - TRAFFIC MAINTAINED WITH FLAGGERS AND PILOT CAR -
EXPECT DELAYS - COMPLETION EXPECTED 10/17/08.
M24
M25
S1
S2 SD11 - FROM SD42 SOUTH - 1.4 MILES -
INTERSECTION IMPROVEMENT AT SD42 AND 26TH STREET ALONG WITH ROADWAY
RECONSTRUCTION OF SD11 NEAR SD42 - GRADING, PCC PAVING, STRUCTURES,
TRAFFIC SIGNAL, ROADWAY LIGHTING, STORM SEWER AND CURB AND GUTTER -
THROUGH TRAFFIC MAINTAINED ON A ON-SITE DETOUR UNTIL APPROXIMATELY JULY
18, 2008 - REDUCED SPEED - **11 FOOT WIDTH RESTRICTION** -
COMPLETION EXPECTED 10/03/08.
S3
I-90 - FROM EXIT 390 TO MRM 397 - 7.4 MILES - GRADING, PCC PAVING AND
STRUCTURES - TRAFFIC MAINTAINED HEAD TO HEAD IN THE WESTBOUND LANES -
**11 FOOT WIDTH RESTRICTION** - VARIOUS RAMPS AT THE I-90 AND I-29
INTERCHANGE CLOSED WITH DETOURS PROVIDED - OVERWIDTH DETOUR PROVIDED -
COMPLETION EXPECTED 09/26/08.
S4
S5
S6
S7
S8
S9
S10
S11
S12
S13
Y1 SD50L - FROM THE WEST CITY LIMITS TO THE EAST
CITY LIMITS IN VERMILLION (CHERRY STREET) - 3.5 MILES - GRADING, STORM
SEWER, SIGNALS, LIGHTING AND PCC PAVING - TRAFFIC MAINTAINED HEAD TO HEAD
IN THE EASTBOUND LANES - **10 FOOT WIDTH RESTRICTION** - TRAFFIC
CAN USE SD50 BYPASS - COMPLETION EXPECTED 11/26/08.
Y2 SD25 - FROM THE SOUTH CITY LIMITS TO
THE NORTH CITY LIMITS IN SCOTLAND - 0.9 MILES - GRADING, CURB AND GUTTER,
ASPHALT SURFACING, LIGHTING AND BOX CULVERT - TRAFFIC WILL BE DETOURED
AROUND IN-PLACE BRIDGE - TRAFFIC WILL ALSO BE DETOURED AROUND THE PROJECT
ONTO CITY STREETS - COMPLETION EXPECTED 11/26/08.
Y3 SD46 - FROM BERESFORD EAST TO THE IOWA
BORDER - 16.0 MILES - COLD MILLING, ASPHALT CONCRETE RESURFACING AND PIPE
EXTENSIONS - TRAFFIC MAINTAINED WITH FLAGGERS AND PILOT CAR - COMPLETION
EXPECTED 10/31/08.
Y4
Y5
Y6
Y7
Y8
Y9
Y10
Y11
Y12
Y13
Y14
MO1
MO2
MO3
MO4
MO5
MO6
MO7
MO8
MO9
MO10
MO11
MO12
P1 SD73 - FROM I-90 NORTH TO PHILIP - 14.0
MILES - ASPHALT CONCRETE MILLING AND ASPHALT CONCRETE RESURFACING -
TRAFFIC MAINTAINED WITH FLAGGERS AND PILOT CAR - EXPECT DELAYS - COMPLETION EXPECTED 09/26/08.
P2 US14 - FROM JCT US83 EAST TO EAST OF
BLUNT - 7.0 MILES - CONCRETE PAVEMENT REPAIR - TRAFFIC MAINTAINED WITH
FLAGGERS AND PILOT CAR - EXPECT DELAYS - **14 FOOT WIDTH RESTRICTION**
- COMPLETION EXPECTED 10/31/08.
P3 US83 - FROM 2ND AVENUE SOUTH IN FORT
PIERRE - 0.6 MILES - CURB AND GUTTER, SIDEWALK, CONCRETE PAVING, ASPHALT
CONCRETE SURFACING, TRAFFIC SIGNALS AND LIGHTING - **14 FOOT WIDTH
RESTRICTION** - ONE LANE TRAFFIC MAINTAINED IN EACH DIRECTION -
COMPLETION EXPECTED 10/31/08.
P4 US14/US83 - MISSOURI RIVER BRIDGE BETWEEN
PIERRE AND FORT PIERRE - 0.4 MILES - STRUCTURE REPAIR - **10 FOOT WIDTH
RESTRICTION** - ONE LANE TRAFFIC MAINTAINED IN EACH DIRECTION -
COMPLETION EXPECTED 07/03/09.
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
WN1 I-90 - FROM MRM 166 TO MRM 168 - 2.0
MILES - BRIDGE CONSTRUCTION - TRAFFIC MAINTAINED THROUGH PROJECT - COMPLETION EXPECTED 09/01/08.
WN2 I-90 - FROM RELIANCE TO KENNEBEC -
15.0 MILES - ASPHALT CONCRETE PAVING, EDGE DRAINS AND MEDIAN WORK -
TRAFFIC MAINTAINED HEAD TO HEAD - **12 FOOT WIDTH RESTRICTION** -
SIGNED OVERWIDTH DETOUR - COMPLETION EXPECTED 09/30/08.
WN3
WN4 SD44 - FROM KYLE CORNER TO WANBLEE - 12.0
MILES - ASPHALT CONCRETE RESURFACING AND SLOPE FLATTENING - TRAFFIC
MAINTAINED WITH FLAGGERS AND PILOT CAR - COMPLETION EXPECTED 09/30/08.
WN5
WN6
WN7 US18 - 1 MILE WEST OF MISSION - 2.0
MILES - LANE WIDENING AND PCC PAVING - TRAFFIC MAINTAINED THROUGH THE
PROJECT - COMPLETION EXPECTED 11/21/08.
WN8
WN9
WN10
WN11
WN12
WN13
WN14
WN15
WN16
B1
B2
B3
B4 SD20 - PRAIRIE CITY EAST TO BIXBY ROAD - 12.1 MILES - GRADING, STRUCTURES
AND INTERIM SURFACING - TRAFFIC MAINTAINED WITH FLAGGERS AND PILOT CAR -
EXPECT DELAYS - COMPLETION EXPECTED 09/15/08.
B5 US85 - FROM SOUTH OF JCT SD168 (MRM 78)
TO BUTTE/HARDING COUNTY LINE (MRM 100) - 22.0 MILES - CRACK SEALING OF
ASPHALT CONCRETE - TRAFFIC MAINTAINED WITH FLAGGERS AND PILOT CAR -
MINIMAL DELAYS - COMPLETION EXPECTED 10/15/08.
B6 SD79 - FROM JCT US212 SOUTH TO JCT SD34 -
18.0 MILES - CRACK SEALING OF ASPHALT CONCRETE - TRAFFIC MAINTAINED WITH
FLAGGERS AND PILOT CAR - MINIMAL DELAYS - COMPLETION EXPECTED 10/15/08.
B7
B8
B9
B10
B11
B12
B13
B14
B15
R1 I-90 - FROM 1 MILE EAST OF EXIT 51 TO 1
MILE WEST OF EXIT 51 - 2.0 MILES - EXIT 51/HWY 79/PEACEFUL PINE ROAD
RECONSTRUCTION - GRADING ADJACENT TO THE ROADWAY - TWO-WAY TRAFFIC 0.5
MILE WITH LANE CLOSURES - **12 FOOT WIDTH RESTRICTION** - NO
IMPACTS TO I-90 TRAFFIC EXPECTED BETWEEN JULY 26 AND AUGUST 11 - COMPLETION
EXPECTED 10/30/09.
R2
R3
R4 I-90 - EXIT 60 TO EXIT 63 IN RAPID CITY
- 3.0 MILES - EXIT 61 INTERCHANGE - ELK VALE ROAD RECONSTRUCTION -
GRADING AND SURFACING ON ELK VALE ROAD BETWEEN MALL DRIVE AND SEGER DRIVE - TRAFFIC MAINTAINED WITH FLAGGERS AND LANE
CLOSURES -
MINOR DELAYS POSSIBLE
- COMPLETION EXPECTED 08/25/08.
R5 SD44
- FROM LONGVIEW ROAD TO AIRPORT ROAD EAST OF RAPID CITY - 4.3 MILES -
GRADING AND CONCRETE PAVING - TRAFFIC MAINTAINED WITH
FLAGGERS - MINOR DELAYS EXPECTED JULY 31 THROUGH AUGUST 11 - AFTER AUGUST
11 EXPECT 10 MINUTE DELAYS - REDUCED SPEED - **14 FOOT WIDTH RESTRICTION
- COMPLETION EXPECTED
10/15/08.
R6 I-90 - FROM EXIT 37 TO EXIT 40 - 2.0
MILES - GRADING AND CONCRETE PAVING - TRAFFIC MAINTAINED HEAD TO HEAD IN
THE WESTBOUND LANES -
MINOR DELAYS POSSIBLE - REDUCED SPEED - **16 FOOT WIDTH RESTRICTION** - COMPLETION EXPECTED
11/03/08.
R7
R8
R9
US14A - FROM JCT US14A/US85 AT CHEYENNE CROSSING
NORTH - MRM 28.65 TO MRM 29.15 - 0.5 MILE - GRADING, SURFACING, CURB AND
GUTTER - ONE LANE TRAFFIC MAINTAINED BY FLAGGERS DURING DAYTIME HOURS AND
TEMPORARY SIGNALS DURING NIGHT TIME HOURS - ROADWAY WILL BE OPEN TO TWO
LANES FROM JULY 30 TO AUGUST 11 - COMPLETION EXPECTED 10/05/08.
R10
R11
R12
R13
R14
R15
C1 SD71 - FROM 1 MILES NORTH OF ARDMORE NORTH -
1.0 MILES - STRUCTURE REPLACEMENT AND APPROACH GRADING - TRAFFIC
MAINTAINED WITH ON-SITE DETOUR - COMPLETION EXPECTED 06/14/08.
C2
C3 US16 - FROM JCT US16A IN CUSTER NORTH - 1.5
MILES - COLD MILLING ASPHALT CONCRETE, ASPHALT CONCRETE RESURFACING, CURB
AND GUTTER, PAVEMENT MARKING AND APPROACH FLATTENING - TRAFFIC MAINTAINED
WITH FLAGGERS - EXPECT DELAYS - COMPLETION EXPECTED 10/24/08.
C4 US16 - FROM WEST OF JEWEL CAVE NATIONAL
MONUMENT EAST - 6.0 MILES - CRACK SEALING AND ASPHALT SURFACE TREATMENT
(CHIP SEAL) - TRAFFIC MAINTAINED WITH FLAGGERS - EXPECT DELAYS -
COMPLETION EXPECTED 09/26/08.
C5
C6 SD40 - FROM KEYSTONE TO HERMOSA - 15.8 MILES - CRACK
SEALING AND ASPHALT SURFACE TREATMENT (CHIP SEAL) - TRAFFIC MAINTAINED
WITH FLAGGERS - EXPECT DELAYS - COMPLETION EXPECTED 09/26/08.
C7 SD87 - FROM JCT US16A TO JCT SD89 - 14.0
MILES - CRACK SEALING AND ASPHALT SURFACE TREATMENT (CHIP SEAL) - TRAFFIC
MAINTAINED WITH FLAGGERS - EXPECT DELAYS - COMPLETION EXPECTED 09/26/08.
C8
C9
C10
C11
**End of Report** |