

|

|

SDDOT / Road Design / What's New
4/2/2009
Update in Section 6 of WQEP Design Manual
Section 6 of the design manual has been updated to include more information on BMP selection. It was added to the manual in an attempt to get all design information in one easy to find document. The BMP selection information is now in Section 6.5. The Erosion and Sediment Control Design Computation Worksheets that were once located in this section were moved to a newly created Section 6.6.
You can see the updated Water Quality Enhancement Program Design Manual here.
|
|
|