Exit 30
What is being built?
Schedule
Work in Progress
Photos
Feedback
Home
Project Schedule
2009 Work
  • Construct median crossovers and temporary ramps at Exit 30 off and on ramp locations.
  • Reconstruct I-90 Eastbound lanes from west of Exit 32 to the Lawrence County line
  • Structure improvements:
    • EB structure at Bear Butte Creek
      • Construct new approach and sleeper slabs, and apply an epoxy chip seal to the existing bridge deck surface
    • EB structure at Exit 30 over Hwy 14A
      • Construct new approach and sleeper slabs and install a nonmetallic fiber reinforced concrete overlay on the bridge deck surface.
    • EB structure of the DM & E Railroad
      • Construct new approach and sleeper slabs, repaint the bridge girders, and install a low slump dense concrete overlay on the bridge deck surface
    • EB structure over County Road
      • Remove the existing rubberized asphalt chip seal from the bridge deck surface and apply an epoxy chip seal.
  • Construct median crossovers and upgrade detour route surfacing in preparation for the 2010 project work
2010 Work
  • Reconstruct I-90 Westbound lanes from west of Exit 32 to the Lawrence County line
  • Structure improvements:
    • WB structure at Bear Butte Creek
      • Construct new approach and sleeper slabs, and apply an epoxy chip seal to the existing bridge deck surface
    • WB structure at Exit 30 over Hwy 14A
      • Widen the structure, construct new approach and sleeper slabs, and install a nonmetallic fiber reinforced concrete overlay on the bridge deck surface.
    • WB structure of the DM & E Railroad
      • Construct new approach and sleeper slabs, repaint the bridge girders, and install a low slump dense concrete overlay on the bridge deck surface
    • WB structure over County Road
      • Remove the existing rubberized asphalt chip seal from the bridge deck surface and apply an epoxy chip seal.
  • Remove median crossovers
  • Permanent pavement markings, guardrail, and signing.