ABERDEEN 3-46-0001-28-2007 SRE (2 SKID STEERS); E.A. FOR WILDLIFE HAZARD MITIGATION (FILL WETLANDS & MITIGATION PLAN); CARD CONTROLLED GATES.
ABERDEEN 3-46-0001-29-2007 TAXIWAY D RECONSTRUCTION 50' WIDE (13" CONCRETE) W/ EXIT AND CONNECTOR TAXIWAYS AND NEW TERMINAL APRON TAXIWAY
BROOKINGS 3-46-0005-18-2006/07 CONDUCT ENVIRONMENTAL STUDY (EA) (PHASE I-SITE SELECTION/ALTERNATIVES)
BROOKINGS 3-46-0005-20-2007 REHAB. ELECTRICAL SIGNS AND INSTALL SUPPLEMENTARY WINDCONE
PIERRE 3-46-0044-22-2007 RECONSTRUCT PARALLEL TAXIWAY TO RWY 13/31 (SE END PHASE I); ACQUIRE RPZ AND APPROACH PROTECTION FEE PROPERTY.
RAPID CITY 3-46-0048-34-2007 G.A. SECURITY LIGHTING PROJECT; SECURITY SYSTEM UPGRADE; REHAB.
SIOUX FALLS 3-46-0050-36-2007 PURCHASE NEW FIRE TRUCK (ARFF)(663,157; RWY 15/33 RECONSTRUCTION (4,000,000)
HURON 3-46-0022-23-2007 ALP UPDATE W/ COMPLETE SUREVEY AND NARRATIVE
WATERTOWN 3-46-0058-19-2007 ACQUIRE RPZ FEE LAND (RWY END 35 AND 30); DESIGN ENGINEERING FOR TERMINAL IMPROVEMENTS
WATERTOWN 3-46-0058-20-2007 WILDLIFE FENCING
BELLE FOURCHE 3-46-0072-08-2007 REHABILITATE RUNWAY, APRON, TAXIWAY; MARKING (OVERLAY); M.I.R.L.
CANTON 3-46-0007-03-2007 CONSTRUCT SNOW REMOVAL EQUIPMENT BUILDING
CUSTER COUNTY 3-46-0011-07-2007 PHASE II INTERIOR CONSTRUCTION FOR GA TERMINAL (55% ELIGIBLE)
DESMET 3-46-0063-06-2007 DESIGN RECONSTRUCTION OF RUNWAY, APRON, TAXIWAY (PHASE I)
EAGLE BUTTE 3-46-0068-05-2007 CONSTRUCT 80'X80' REVENUE PRODUCING HANGAR WITH G.A. TERMINAL (PHASE II)
FLANDREAU 3-46-0077-02-2007 DESIGN AND CATEX: EXPAND APRON AND CONSTRUCT NEW BACK HANGAR TAXIWAY
GETTYSBURG 3-46-0017-07-2007 INSTALL WEATHER REPORTING FACILITY
GREGORY 3-46-0018-06-2007 RUNWAY OVERLAY; PARTIAL RECONSTRUCT 800' SE RWY END; PAPI RWY 13/31; INCLUDES ELECTRICAL VAULT COMPLETED IN 2005 & APRON EXPANSION COMPLETED IN 2006.
HIGHMORE 3-46-0019-04-2007 CONSTRUCT SRE BUILDING 30' X 34'
HOT SPRINGS 3-46-0020-06-2007 INSTALL AUTOMATED WEATHER REPORTING FACILITY
LINCOLN COUNTY 3-46-0078-07-2007 DUAL TRACKING E.A./SITE SELECTION
MARTIN 3-46-0030-05-2007 APRON AND EXIT TAXIWAY (OVERLAY); RECONSTRUCT HANGAR TAXIWAY
MILBANK 3-46-0034-09-2007 DESIGN ENGINEERING; REHAB. APRONS AND TAXIWAYS WITH TRENCH DRAIN FOR TERMINAL; ACQUIRE ELECTRIC GATE; REPLACE WINDCONE.
MOBRIDGE 3-46-0038-08-2007 CONDUCT E.A. FOR FUTURE RWY EXTENSION
MURDO 3-46-0039-05-2007 REHABILITATE RUNWAY AND EXIT TAXIWAY (OVERLAY); RECONSTRUCT APRON
PINE RIDGE 3-46-0045-09-2007 DESIGN ENGINEERING, E.A. FOR 2008 MIRL WITH PAPI RWY
SISSETON 3-46-0051-07-2007 PARTIAL APRON RECONSTRUCTION/SRE PAVING
SPEARFISH 3-46-0065-13-2007 ACQUIRE LAND FOR RWY EXTENSION; ROAD RELOCATION; PHASE I (DIRT WORK); PHASE I LAND
VERMILLION 3-46-0056-06-2007 RUNWAY CONCRETE OVERLAY (5-6")
WAGNER 3-46-0057-05-2007 DESIGN 2008 APRON RECONSTRUCTION AND EXPANSION
WALL 3-46-0069-04-2007 UPDATE AIRPORT LAYOUT PLAN (ALP)
WINNER 3-46-0061-08-2007 CONSTRUCT REVENUE PRODUCING HANGAR (80' X 120')
YANKTON 3-46-0062-17-2007 CONSTRUCT CONNECTOR TXY FROM APRON TO TXY (1,930 S.Y. PAVED); CONSTRUCTION PORTION OF APRON WITH PCC PAVEMENT IN FRONT OF NEW FBO BUILDING (APPROX. 2,300 S.Y. PAVED)
Department of Transportation Sponsored Projects
SDDOT (Project #10) ACQUIRE SRE (TRACTOR/LOADER/BLOWER/BROOM/BLADE) FOR HIGHMORE
SDDOT (Project #11) PAVEMENT MAINTENANCE FOR:
BRITTON
CANTON
CHAMBERLAIN
EAGLEBUTTE
FAULKTON
FLANDREAU
HOVEN
LEMMON
MILLER
MITCHELL
PARKSTON
PLATTE
SISSETON
VERMILLION
WEBSTER
WESSINGTON
|
|