SDDOT - Public Hearings, Meetings, & Meeting Agendas Testing
Transportation Commission Meeting Minutes
1/22/2009
01/22/2009 Transportation Commission Meeting Minutes
TRANSPORTATION COMMISSION MEETING
JANUARY 22, 2009
PIERRE, SOUTH DAKOTA
Present: Ralph Marquardt, Chairman
Jim Spies, Vice Chairman
Jerry Shoener, Member
Rod Fouberg, Member
Bob Benson, Member
John Kranz, Member
Dick Gregerson, Member
Mike Trucano, Member
Absent: Sam Tidball, Member
Others in Attendance: Toby Crow, AGC, Bob Mercer, AP
DOT Staff: Kevin Tveidt, Mike Behm, Bill Nevin, Greg Fuller, Joel Jundt, Dean Van DeWiele, Joel Gengler, Paul Knofczynski, Jason Humphrey, Ryan Johnson, Tim Bjorneberg, John Forman, Amy Brady, and Amy Campbell.
Chairman Marquardt called the meeting to order at 9 a.m.
Motion by Shoener, seconded by Kranz, to approve the December 18, 2008, Conference Call Minutes. Motion carried (all ayes).
*********
Deputy Secretary Kevin Tveidt discussed what bills the DOT has in front of the 2009 Legislation (HB 1023, HB 1024, SB 23, and SB 30) and other bills he DOT is watching (HB 1006, HB 1007, SB 10, SB 11, SB 21 and SB 32).
Deputy Secretary Kevin Tveidt informed the Commission about and gave handouts from Secretary Bergquist’s testimony to the House and Senate Transportation Committees earlier in the session.
Deputy Secretary Kevin Tveidt and Joel Jundt, Director of Planning & Engineering, presented information on the economic stimulus plan, both nationwide and statewide. Joel informed the commission a special meeting or conference call may be needed to approve bid lettings in order to approve STIP amendments of potential projects that currently fall outside FY2009. He informed them that we may need to also add additional lettings in order to handle the additional projects that will be going to contract.
Motion by Trucano, seconded by Shoener, to approve a conference call to handle these bid lettings. Motion carried (all ayes).
A conference call was scheduled for February 19, 2009, at 10 a.m. CST.
*********
Bill Nevin, Legal Counsel, presented an update regarding the DM&E Hearing held in Rapid City January 5-9, 2009. Bills advised he felt the hearing went well. There were five days of testimony with 70 exhibits presented. It was determined on the last day of this hearing to continue with closing arguments on Thursday, January 22, 2009, at 1:30 p.m. at the Stanley County Courthouse. Each side will get one and one half hours to present closing arguments. Justice Miller will then like to meet with the Transportation Commission to get their opinions before preparing a proposed decision. This decision will then come before the Transportation Commission for their approval, rejection, or a modification before the final decision is made.
*********
Commissioner Shoener advised the Commission he has received a number of letters from citizens of Mobridge, S.D., concerning opposition of the DOT re-striping their current four-lane highway through the center of town to a three-lane highway. John Forman, Pierre Regional Engineer, explained to the Commission the DOT felt it was safer to change their current four-lane highway to a three-lane highway with a turn lane down the middle. The business people of Mobridge do not want this and have brought their arguments to the DOT. The business community's concern is for possible economic problems created from a three-lane conversion. The DOT has therefore reconsidered and will keep their current four-lane highway. Deputy Secretary Tveidt advised he would make sure a letter went to citizens who have sent letters to the Commissioners.
**********
Jason Humphrey, Construction and Maintenance Engineer, presented the following construction change order for the Aberdeen Region:
ABERDEEN REGION
Project: IM 0299(30)212, Roberts County, PCN 4976 $ 52,567.15
Contractor: Progressive Contractors Incorporated
Type of Work: Bridge Deck Overlay, Approach Slab Replacement, Fatigue Retrofit, & Guardrail Modifications
Location: I-29 SD 15 exit
Project: P 0020(70)344, Clark County, PCN 003F $ (317,783.19)
Contractor: Border States Paving, Inc.
Type of Work: Cold Milling Asphalt Concrete, Cold In Place Recycling, Asphalt Concrete Resurfacing, & Slope Flattening of Approaches
Location: SD 20 from SD 37 east to east of Crocker
Project: NH 0212(93)295, Faulk County, PCN 1116 $ 323,660.27
Contractor: Loiseau Construction, Inc.
Type of Work: Grading, Interim Surfacing, & Approach Slabs
Location: US 212 from Zell to Redfield
Project: NH 0212(107)318, Spink County, PCN 4168 $ (98,301.27)
Contractor: R and G Construction Co.
Type of Work: Grading, Sructures, & Interim Surfacing
Location: US 212 from Frankfort east to Doland
Jason Humphrey, Construction and Maintenance Engineer, presented the following construction change order for the Mitchell Region:
MITCHELL REGION
Project: IM 0909(77)390, Minnehaha County, PCN 01KT $ (125,332.94)
Contractor: Knife River Midwest, LLC
Type of Work: Grading, PCCP Pavement, Deck Overlay, Approach Modification, Asphalt Concrete Surfacing, Guardrail, Pavement Marking
Location: I-90 EBL from SD 38 exit to east of I-29
Project: P-PH 0011(5)81, Minnehaha County, PCN 6229 $ (58,366.30)
Contractor: R and G Construction Co.
Type of Work: Grading, Structures, Partial AC Surfacing, & Permanent Signing
Location: SD 11 from Corson to Garretson
Jason Humphrey, Construction and Maintenance Engineer, presented the following construction change order for the Rapid City Region:
RAPID CITY REGION
Project: NH 0085(40)45, Butte County, PCN 5934 $ (133,148.17)
Contractor: Upper Plains Contracting, Inc.
Type of Work: Nonreinforced PCCP, Grading, Lighting, Pavement Marking, & Permanent Signing
Location: US 85 from I-90 to SD 34 in Belle Fourche
Project: NH 0085(40)45, Butte County, PCN 5934 $ (55,500.00)
Contractor: Upper Plains Contracting, Inc.
Type of Work: Nonreinforced PCCP, Grading, Lighting, Pavement Marking, & Permanent Signing
Location: US 85 from I-90 to SD 34 in Belle Fourche
John Forman, Pierre Region Engineer, presented the following construction change order for the Pierre Region:
PIERRE REGION
Project: NH 0083(30)191, Walworth County, PCN 5931 $ (65,068.66)
Contractor: Anderson Western, Inc.
Type of Work: Asphalt Concrete Surfacing & Resurfacing
Location: US 83 from US 12 to SD 20
*********
Joel Gengler, Right of Way Program Manager, presented the following right-of-way items for Commission consideration:
1. Land Trade – Lincoln County
The Department would like to trade the North 151.95’ of the West 225’ except Lot H1 of the NW1/4 of Section 23, Township 100 North, Range 50 West, 5th P.M., Lincoln County, South Dakota for Lot H2 in the NW1/4, except the West 1320’ of the South 198’ thereof, and except the East 808.54’ of the North 592.62’ including Tract 1 of Beyers Addition contained therein and except the North 151.95’ of the West 225’ thereof, all in Section 23, Township 100 North, Range 50 West, 5th P.M., Lincoln County, South Dakota. There is no money involved in this trade.
This trade is needed for SD Highway 100 and will be used on Project
EM 0100(101)405, PCN 00T7. (See attached).
Motion by Benson, seconded by Spies, to approve land trade in Lincoln County. Motion carried (all ayes).
2. Relinquish Control of Access – Lake County (Amending Amended Resolution)
This resolution will grant a 36 foot approach at MRM 388+0.818 Right and a 40 foot approach at MRM 389+0.147-228 feet Right. This resolution was approved by the Commission during the November 2008 meeting. The 40’ approach was missed on this resolution.
Motion by Kranz, seconded by Shoener, to approve relinquishment of control of access in Lake County. Motion carried (all ayes).
Resolution Number 2009-1.01 was approved
3. Condemnation – PH-NH-EM 0081(30)155 – PCN 6716 – Codington County
Intersecting of US212/US81; US81 (5th Street E.) North of the US212 Junction
through 14th Avenue North in Watertown
A. Parcel 39 – 739 Arrow, LLC
B. Parcel 41 – Journey – Citimortgage (mortgage release)
Motion by Fouberg, seconded by Trucano, to approve condemnation in Codington County. Motion carried (all ayes).
Resolution Number 2009-1.02 was approved
4. Condemnation – P 0034(92)414 – PCN 00WE – Moody County
From 1 mile West of SD13 to Minnesota State Line
A. Parcel 71 – Recon Trust Company (mortgage release)
B. Parcel 75 – Gary C. & Alice M. Erickson
C. Parcel 76 – Trevor Erickson
D. Parcels 77, 89 – Gary C. Erickson
Motion by Fouberg, seconded by Spies, to approve condemnation in Moody County. Motion carried (all ayes).
Resolution Number 2009-1.03 was approved for Parcel A.
Resolution Number 2009-1.04 was approved for Parcel B.
Resolution Number 2009-1.05 was approved for Parcel C.
Resolution Number 2009-1.06 was approved for Parcel D.
*********
Dean VanDeWiele, Engineering Supervisor, Project Development, presented bids from the January 21, 2009 bid letting.
January 21, 2009 Letting
Structure & Approach Grading (26' Single Span Prestressed Double Tee Bridge)
1 BRO 8028(09), Haakon County
Heavy Constructors, Inc. Rapid City, SD $231,011.58
County Road 4.1 miles south & 7.2 east of Milesville
Structure & Approach Grading (83' 3 Span Prestressed Double Tee Bridge)
2 BRF 6410(04), Butte County
Heavy Constructors, Inc. Rapid City, SD $554,496.98
County Road 5.5 miles east & 0.2 miles south of
Newell over Willow Creek
Structure & Approach Grading (495' 6 Span Prestressed Girder Bridge)
3 BRF 3103(01), Lincoln County
Withdrawn from Letting, $ .00
County Road over the Big Sioux River at the Iowa State Line
Asphalt Concrete Resurfacing, Guardrail Updates, Durable Pavement Marking & Deer
Reflectors
4 P 014A(01)42, Lawrence County
Northern Improvement Company Fargo, ND $1,765,757.44
US14A from the junction with US85 north of Deadwood
to the Wormdahl Road (Boulder Canyon Country Club)
Cold Milling Asphalt Concrete & Asphalt Concrete Resurfacing
5 P 0044(141)146, Jackson County
Bituminous Paving, Inc. Ortonville, MN $1,837,998.24
SD44 from east of Wanblee to the SD73 junction
Motion by Kranz, seconded by Shoener, to award projects 1, 2, & 5 to the low bidder subject to required concurrences and submittal of necessary good faith doctrine. Motion carried (all ayes).
Motion by Trucano, seconded by Shoener, to award project 4 to the low bidder subject to required concurrences. Motion carried (all ayes).
Project 3 was withdrawn and will be re-let at a later date.
*********
Dean VanDeWiele, Engineering Supervisor, Project Development, presented a brief summary of anticipated bid lettings for 2009 to the Commission as informational items. These edits do not require Commission approval.
*********
Mike Behm, Assistant Director of Planning & Engineering, presented the 2009-2013 Statewide Transportation Improvement Program Revisions 09-014 and 09-015 to the Commission for their approval.
Motion by Spies, seconded by Trucano, to approve the 2009-20013 Statewide Transportation Improvement Program Revision 09-014. Motion carried (all ayes).
Motion by Shoener, seconded by Benson, to approve the 2009-20013 Statewide Transportation Improvement Program Revision 09-015. Motion carried (all ayes).
*********
Mike Behm, Assistant Director of Planning & Engineering, presented a brief summary of informational project edits to the 2009-2013 Statewide Transportation Improvement Program Revisions to the Commission as informational items. These edits do not require Commission approval.
*********
Amy will send an email to the Commissioners requesting travel information for the DM&E Hearing held in Rapid City at the beginning of the month and get those reimbursements processed.
*********
Commissioner Spies commented that NE SD has a lot of snow yet and is concerned about flooding when the snow melts.
*********
There being no further business, at the hour of 11:12 a.m. the Transportation Commission adjourned.
Submitted by
Amy Campbell Approved by
Darin Bergquist
Secretary
|
|
|