Transportation Commission Conference Call Minutes
2/19/2009
Transportation Commission Conference Call Minutes
TRANSPORTATION COMMISSION CONFERENCE CALL MEETING
FEBRUARY 19, 2009
PIERRE, SOUTH DAKOTA
PRESENT: Sam Tidball, Member
Absent: Mike Trucano, Member
Via Phone: Ralph Marquardt, Chairman
Jim Spies, Vice Chairman
Rod Fouberg, Member
Jerry Shoener, Member
Dick Gregerson, Member
Bob Benson, Member
John Kranz, Member
OTHERS PRESENT: Toby Crow, AGC, John Rohlf, FHWA, Bob Mercer, AP, Terry
Wooster, AP, Laurie Schultz, Brosz Engineering, Gerald Johnson, AGE Corp, Jim Jenssen, DAPA,
DOT Staff: Darin Bergquist, Kevin Tveidt, Joel Jundt, Paul Knofczynski, Dean Van DeWiele, Bill Nevin, Julie Bolding, Mike Behm, Amy Brady, Greg Fuller, Tim Bjorneberg, and Amy Campbell
********
Commission Member Tidball called the meeting to order at 10:05 a.m.
Roll call was taken.
Motion by Shoener, seconded by Spies, to approve the January 22, 2009, Commission Meeting Minutes. Motion carried (all ayes).
********
Dean VanDeWiele, Engineering Supervisor, Project Development, presented bids from the February 4, 13, and 18, 2009 bid lettings.
February 4, 2008
1 Moved to February 13th Letting
Pavement Restoration
2 NH 0018(148)446, Lincoln County
Dakota Contracting Corporation Sioux Falls, SD $203,805.60
US18 from the east junction with SD11 to Bartlet Street in Canton
Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing, Spot Repair & Gurardrail
3 P 0044(75)88, Pennington County
Northern Improvement Company Fargo, ND $5,195,366.84
SD44 from the east Scenic entrance to the Conota Road
Asphalt Surface Treatment (Sand Seal)
4 P 0012(141), Brookings, Deuel, Hamlin, Roberts County
The Road Guy Construction Co Inc Yankton, Sd $1,531,849.63
Various Locations in the Watertown Area
Motion by Fouberg, seconded by Shoener, to award projects, 2, 3, & 4 to the low bidder subject to submittal of good faith effort documentation. Motion carried (all ayes).
February 13, 2009
Nonreinforced PCC Pavement Guardrail, Deck Overlay, Approaches on 8 Structures &
Widen Westbound Structure @ Exit 30
1 IM 0901(109)28, Meade County
Heavy Constructors, Inc. Rapid City, SD $11,354,278.00
Interstate 90 (EB & WB) from near the Lawrence Co line to
Exit 32 at Sturgis
Motion by Shoener, seconded by Fouberg, to award project 1 to the low bidder. Motion carried (all ayes).
*********
February 18, 2009
Bridge Deck Concrete Patching
1 BRF 6531(07), Lyman County
J. V. Bailey Co. Inc. Rapid City, SD $55,449.50
County Road 0.8 miles north of Presho over Medicine Creek
Grading, Storm Sewer, PCC Pavement, Curb & Gutter, Sidewalk, Roadway Lighting &
Traffic Signals
2 PH-NH-EM 0081(30)155, Codington County
T&R Contracting Inc. Sioux Falls, SD $7,958,963.03
US81 (4th Street East) from 12th Avenue South to 14th
Avenue North in Watertown
Nonreinforced PCC Pavement, Bridge Approach Modification, Guardrail and Culvert
Safety Improvement
3 IM 0294(58)110, Moody County
C.S. McCrossan Construction, Inc. Maple Grove, MN $11,989,290.58
Interstate 29 (NBL) from SD34, north to Exit 121
Signing Project
4 PH 8045(01), McPherson County
Bestway Traffic, Inc. Mobridge, SD $260,363.16
Various County Roads in McPherson County
Asphalt Surface Treatment (Chip Seal)
5 P 0021(87), Aurora, Beadle, Brule, Buffalo, Charles Mix, Davison, Gregory,
Hanson, Jerauld, McCook, Sanborn County
Bituminous Paving Inc Ortonville, MN $3,731,735.08
Various Locations in the Mitchell Area
Asphalt Surface Treatment (Chip Seal)
6 P 0011(56), Brown, Day, Faulk, Marshall County
McLaughlin & Schulz, Inc. Marshall, MN $963,139.15
Various Locations in the Aberdeen Area
Asphalt Surface Treatment (Chip Seal)
7 P 0042(37), Butte, Harding, Meade, Perkins County
Jensen Rock & Sand Inc Mobridge, SD $2,984,268.17
Various Locations in the Belle Fourche Area
Cold Milling Asphalt Concrete, Process in Place, Asphalt Concrete Resurfacing, & Box
Culvert Extension
8 P 0044(139)330, Douglas, Hutchinson County
Spencer Quarries Incorporated Spencer SD, SD $4,730,636.38
SD44 from the east junction of US281, east to the junction of SD37
ADA Upgrade
9 NH 0016(70)67, Pennington County
Stanley J. Johnsen Concrete Contractor Rapid City, SD $87,724.20
Intersection of St. Patrick St. & US16 (Mt Rushmore Road) in Rapid City
Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing, Intersection Modification,
Spot Repair of Mainline,Underdrains, End Block Modification, Guardrail, Update Weigh
in Motion Electronics, & Contractor Furnished Asphalt Concrete
10 P 0014(148)202, 063-352, P 0014(162)189, Stanley County
Spencer Quarries Incorporated Spencer SD, SD $7,427,078.89
US14 from 7.7 miles east of Hayes to west of SD1806 & US14
at the junction of SD34 & SD63
Motion by Marquardt, seconded by Kranz, to award projects 2, 3, 4, 5, 6, 8, & 9 to the low bidder subject to required concurrences and submittal of necessary good faith effort documentation. Motion carried (all ayes).
Motion by Benson, seconded by Spies, to award project 1 to the low bidder subject to approval of required county concurrence. Motion carried (all ayes).
Motion by Shoener, seconded by Benson, to award project 7 to the low bidder subject to submittal of good faith effort documentation. Motion carried (all ayes).
Motion by Marquardt, seconded by Fouberg, to award project 10 to the low bidder. Motion carried (all ayes).
*********
Secretary Bergquist discussed with the Commission the status of the Stimulus Package President Obama signed in regards to transportation. $189 million dollars was awarded to SD for Highway construction projects. This money is not required to be matched by state funds. 50% of the state's funds must be obligated within 120 days of the money being available. The Department has more than this amount of projects ready and does not anticipate any difficulty in meeting this requirement. At the February 26th Commission meeting, the Department will request the Commission to take action on suballocating a portion of these funds to local government entities. These funds not obligated by states within the required timeframe will revert to Congress and be redistributed to those states that have used all their available funds. The Department is making every effort to ensure it uses all its funds and is in line for any additional funds that may be redistributed.
*********
Mike Behm, Assistant Director of Planning & Engineering, presented a list of program revisions to the 2009 Statewide Transportation Improvement Program for potential funding by the ARARA.
Motion by Shoener, seconded by Marquardt, to approve adopting of the changes in the STIP Program. Motion carried (all ayes).
*********
Bill Nevin, Legal Counsel, presented an update regarding the DM&E Hearing. All parties
have submitted their final briefs. Justice Miller is working on his proposed decision. There is no time frame for this, but hopefully by the March 26, 2009 meeting, Justice Miller will have a proposed decision for the Commission to consider.
*********
There being no further business, at the hour of 11:08 a.m. the conference call for the Transportation Commission adjourned.
Submitted by
Amy Campbell Approved by
Darin Bergquist