  Highway 44, Platte
  Highway 44, RC
  I-90 Exit 40 to 32
  I-90 Exit 52
  I-90 Exit 61
  Sturgis Road
  Various SF
   projects
  STIP - 5 yr plan

Back to SD DOT
Site Index
Search this Site
Help
Feedback
Contacts




I90
What is being built?
Schedule
Work in Progress
Photos
Feedback
Home
Photo Gallery

April 2008 Photos
Click on photo for larger image
Multiplate Walls
Excavation for the lower portion of the footing for the north wall

Multiplate Walls
Backfilling north wall footing (right)

Multiplate Walls
Footing for the north wall of the multiplate extension

Multiplate Walls
Preparing for placement of concrete for the south wall footing

Multiplate Walls
Placing concrete in south wall footing form

Multiplate Walls
Form for south wall footing

Multiplate Walls
Placing concrete with a bucket in the south wall footing form




Multiplate Walls
Multiplate Walls
Multiplate Walls
Multiplate Walls
Installation of the wall panels on the north side of the Multiplate structure adjacent to the westbound lanes of I-90. This structure is being extended to allow the westbound lanes to be shifted to the north and provide a wider and safer median.