Excavation for the lower portion of the footing for the north wall
|
Backfilling north wall footing (right)
|
Footing for the north wall of the multiplate extension
|
Preparing for placement of concrete for the south wall footing
|
Placing concrete in south wall footing form
|
Form for south wall footing
|
Placing concrete with a bucket in the south wall footing form
|
|
|
|
|
|
|
Installation of the wall panels on the north side of the Multiplate structure adjacent to the westbound lanes of I-90. This structure is being extended to allow the westbound lanes to be shifted to the north and provide a wider and safer median.
|