SDDOT / Operations Support / Standard Specifications / 1998 Spec. Book / Special Provisions
Special Provision Checklist
June 12, 2003 - Word document
Special Provision Detailed List (description & proper use)
June 12, 2003 - Word document
|
Standard Special Provisions - Word Documents
Note: Project specific Special Provisions are not included in this list
1. Formal Partnering, dated 8-14-97
2. Informal Partnering, dated 8-14-97
3. QC/QA, dated 10-17-01
4. Progress Schedule (CPM), dated 9-28-99
5. Fine Aggregate, dated 11-8-99
6. Bridge End Backfill, dated 6-12-03
7. QC/QA Superpave, dated 10-17-01
8a. A. Structural Concrete Contractor Mix Design, dated 11-3-01
8b. B. Acceptance of 28 day compressive strength structural concrete (Section 460), dated 2-20-02
9. PCC Pavement Smoothness (0.2 blanking band), dated 9-17-02
10. PCCP Grinding with Incentive, dated 1-20-01
11. PCCP Grinding without Incentive, dated 1-20-01
12. Crosshole Sonic Log Testing, dated 4-13-01
13. PCCP Dowel Bar Retrofit, dated 1-30-01
14. Epoxy Chip Seal, dated 9-20-02
15. Surface Preparation for Epoxy Chip Seal, dated 10-22-01
16. Removal of Rubberized Asphalt Chip Seal, dated 1-18-00
|
|