Project Development Logo
SDDOT Logo
Main Navigation
   Office Info.
   Bid Letting
   Environmental
   Planning
   Railroad Safety
   Traffic Safety

Planning
   Bicycle & Ped.
   Corridor
    Preservation

   Data Analysis
   Early Utility Coord.
   Hwy. Classification
   Long Range Plan
   MPO
   Pvmt. Management
   Scenic Byways
   Special Studies
   STIP

Back to SD DOT
Site Index
Search this Site
Help
Feedback
Contacts


Arc Graphic


Project Development Header



SDDOT / Project Development / Planning / Special Studies
US14A (Colorado Boulevard) through Spearfish


Reason for Study:

In response to continually increasing traffic congestion along Colorado Boulevard and at I-90 Exit 14 in Spearfish, the South Dakota Department of Transportation has targeted the U.S. 14 Alternate Highway Corridor through the City of Spearfish for a corridor preservation study.

Study Limits:

The study will examine the highway corridor’s influence area. The route to be studied follows 27th Street from 1st Avenue to Colorado Boulevard, Colorado Boulevard from 27th Street to Spearfish Canyon Road, and the ramps of I-90: Exit 14. Public Meetings

The South Dakota Department of Transportation (SDDOT) has a long history of public involvement in the development of transportation plans and projects. The 2005 passage of the Safe, Accountable, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) requires a public involvement process. In accordance with the Department's draft public participation document, the US14A Corridor Study strives to keep the public involved with the study as much as possible. Public meetings for the study will occasionally be scheduled to collect public input, provide information and answer questions

Public Meeting #1 – June 25, 2009 Study Advisory Team:

Given the importance of the corridor and the potential for future development within and east of the corridor’s influence area, the SDDOT has established a study advisory team to help provide input from differing points of view. The study advisory team comprises of representatives from adjacent stakeholders interested in the future of the area. The study advisory team will meet throughout the study period. For more information or comments please contact Steve Gramm by email at steve.gramm@state.sd.us or by phone at (605) 773-6641.




Copyright © State of South Dakota, 1997-2007.
All rights reserved.